Godrej Park Regent construction status is in the pre-launch / Expression of Interest (EOI) stage as of June 2026. Karnataka RERA registration is in process. It is expected by September 2026. The official project launch is scheduled for October 2026. On-site work starts in the weeks that follow. Possession is targeted for October 2030. This page covers the full milestone calendar, the current site status and what to expect at each build stage.

Project Status Snapshot — As of 2026

Status Item Detail
Current stagePre-launch / EOI window open
Karnataka RERAApplication in process — expected September 2026
Official launch dateOctober 2026
Site mobilisationQ4 2026 (post-launch)
Excavation + pilingQ4 2026 – Q1 2027
Foundation completionQ2 – Q3 2027
Superstructure riseQ4 2027 – 2029
Finishing works2030 – Q3 2030
Handover / possessionOctober 2030

Full Milestone Calendar

Pre-Launch (Current)

  • Karnataka RERA application filed and progressing through K-RERA Board review
  • EOI window open — refundable ₹5–6 Lakh reservation locks in the ₹12,000+/sq.ft. pre-launch rate
  • Kada Agrahara Experience Centre operational with 2 BHK and 3 BHK model apartments (9 AM – 7 PM daily)
  • Site cleared and surveyed; boundary wall and approach-road work commencing

Launch — June 2026

  • Karnataka RERA registration number issued (target September 2026)
  • Official launch on October 2026 with confirmed pricing, inventory and Agreement to Sale templates
  • EOI applicants convert to formal allotment with 10% milestone payment (less EOI)
  • Bank-loan disbursement panel activated (HDFC, ICICI, SBI, Axis, Kotak, PNB, Bank of Baroda, LIC Housing)

Mobilisation — Q4 2026

  • Site office and contractor camp set up
  • Survey markings and gridding finalised against the master-plan layout
  • Tree-preservation and landscape-survey work undertaken
  • Soil-testing and geotechnical reports archived

Excavation & Piling — Q4 2026 to Q1 2027

  • Three basement levels excavated for parking and utility rooms
  • Pile foundations driven for both towers
  • Retaining-wall structure for the basement walls cast
  • Excavation milestone payment due from buyers (~10% of sale consideration)

Foundation — Q2 to Q3 2027

  • Raft and pile-cap foundation cast for both towers
  • Plinth-beam grid completed
  • First-floor slab work begins
  • Foundation milestone payment due (~10%)

Superstructure Rise — Q4 2027 through 2029

  • Slab-by-slab vertical rise — approximately 1 slab every 3–4 weeks per tower
  • By end-2028: 20+ slabs cast per tower (around 60% structural completion)
  • By end-2029: Full structural rise to 3 Basement + Ground + 33 floors
  • Slab milestone payments billed at 1st, 10th, 20th and final slab stages

Finishing Works — 2030 to Q3 2030

  • Brickwork and internal partitions across all apartments
  • Plumbing and electrical rough-in
  • Plastering, flooring, doors, windows, fittings
  • Painting, false ceilings, kitchen modular install
  • Lift commissioning, DG and HT power, sewage treatment plant
  • Landscape and clubhouse fit-out completion
  • Brickwork and flooring/fittings milestone payments due (~10% each)

Handover — October 2030

  • Occupancy Certificate (OC) obtained from BBMP
  • Snagging walkthroughs with buyers and punch-list corrections
  • Final 5% milestone payment plus statutory charges (GST, stamp duty, registration)
  • Apartment Owners' Association handover and key collection

How to Track Progress

  • Site visits: Open to EOI applicants and confirmed buyers via the Kada Agrahara Experience Centre — 9 AM – 7 PM daily.
  • Construction updates: Quarterly emailers sent to EOI applicants and booked buyers with photographs of build progress.
  • Construction status dashboard: Watch this page — milestones are updated as they're certified by the project engineer.
  • Karnataka RERA portal: Post-registration, buyers can view quarterly progress reports on the K-RERA portal under the project's registration number.

Frequently Asked Questions about Construction Status

1. What is the current status of Godrej Park Regent?

The project is in its pre-launch stage. Karnataka RERA registration is in process. It is expected by September 2026. That is ahead of the official launch on October 2026.

2. When does on-site construction start?

Active site mobilisation begins in Q4 2026 immediately after the official launch. Excavation and piling for both towers run from Q1 2027 through Q2 2027.

3. When will the towers reach full height?

Both towers are scheduled to reach their full 3 Basement + Ground + 33 floor structural height by end of 2028. Finishing works run from 2030 through Q3 2030.

4. When is handover scheduled?

Handover and possession are targeted for October 2030, after the Occupancy Certificate is obtained from BBMP and snagging walkthroughs are complete.

5. Can I visit the site during construction?

Yes — EOI applicants and booked buyers can visit the Kada Agrahara Experience Centre at any time (9 AM – 7 PM daily). Once on-site construction begins, the centre will include a viewing deck over the active build zone.

6. How are construction-linked payments triggered?

Each milestone payment is triggered when the corresponding stage is certified complete by the project engineer. Buyers receive an invoice along with the engineer's certification document. The milestone schedule is detailed on the payment-plan page.